CLINICS, TUTORS, HOMESTAYS & GARAGES TEMPLATE

Tower under construction

A construction update as the tower itself rising — a generic apartment block with one band of storeys per stage from the ground up, solid in the brand colour for the stages done, half-raised under scaffolding for the current one — each band beside its stage and date. Buyers see progress, not promises.

Single image9 platformsVoice: Serious, Premium
Sample Tower under construction creative (Clinics, tutors, homestays & garages template), shown on the fictional brand Keystone Homes
Sample at 4:5, shown on Keystone Homes, a fictional brand. MarketiQ fills each template with your brand, facts and copy.

When the AI picks it

MarketiQ’s Creative Director favours the Tower under construction for posts that announce news or prove a point, when the message is a timeline, steps or a process or a story. It is built first to announce news.

It reads each post’s goal and shape first, then its own words, the platform and the facts you have, and offers this template only where it fits.

Announce newsProve a pointa timelinesteps or a processa story

Who it’s for

Made for Real estate. The Director offers it only to brands of that kind, so it never turns up for a business it does not suit.

Platforms and sizes

Sizes Tower under construction is made at on each platform
SizeWhere
4:51080 × 1350 pxInstagram, Facebook, LinkedIn, Threads, Pinterest, Reddit
1:11080 × 1080 pxX, Ads
9:161080 × 1920 pxTikTok

Single image. Each size is laid out for its canvas, not cropped; the sample above is the 4:5 version.

What it needs

Only your post. It is made from your copy and your brand kit — there is nothing else to prepare.

Rules the AI follows

Word for word from the template library. The Director follows the copy rules when it writes into the template, and the visual review checks every creative against the visual rules.

Copy rules

  1. Milestones, dates and their status are exactly what the post reports — never mark a stage done that the post does not.
  2. No possession promises beyond the post's own dates.

Visual rules

  1. A generic apartment block on paper, one band of floors per milestone from the ground up: done bands solid brand colour with pale windows, the current band half built under scaffolding, later bands dashed outlines.
  2. Each band has a dashed tick out to its milestone on a thin rail, read from the ground up: a ticked brand dot for done, a dark dot for now, grey for next, the stage in bold and its date in mono; headline above, booking line below.